Doing morning check. Checked the leakage currents, all ok. Attachment 1
Temperatures ok, attchment 2
System wide check, all correct.
Statistics ok (as far as we can tell) attachment 3
Spectrum browser ok, attachment 4
Checked merger, spinner spinning...
Attachment 5 shows the BPM scope (i.e. induced signals from the ion buchnes) for the duration of injection, bunching, acceleration, debunching.
Beam current is around 2.5E7 and the target dencity is 6.3E11 cm2. |