AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 537     Entry time: Tue Feb 20 13:20:44 2024
Author: OF, AG, JG, ML 
Subject: R48 status check 

Doing afternoon check. Checked the leakage currents, all ok. Attachment 1

Temperatures ok, attchment 2

System wide check, all correct.

Statistics ok (as far as we can tell) attachment 3

Spectrum browser ok, attachment 4

Checked merger, spinner spinning...

 

Beam current is around 2.2 E7 and the target dencity is 6.3E11 cm2.

Attachment 1: Screenshot_from_2024-02-20_14-22-05.png  29 kB  | Hide | Hide all
Screenshot_from_2024-02-20_14-22-05.png
Attachment 2: Screenshot_from_2024-02-20_14-22-49.png  145 kB  | Hide | Hide all
Screenshot_from_2024-02-20_14-22-49.png
Attachment 3: Screenshot_from_2024-02-20_14-29-39.png  109 kB  | Hide | Hide all
Screenshot_from_2024-02-20_14-29-39.png
Attachment 4: Screenshot_from_2024-02-20_14-34-55.png  182 kB  | Hide | Hide all
Screenshot_from_2024-02-20_14-34-55.png
ELOG V3.1.4-unknown