AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Apr 5 01:28:15 2025
Author
*
:
Subject
*
:
<p>27/05/24</p> <p>The carme-gsi computer has been moved from the server room into the shifter control room.</p> <p>Startup of the DAQ looks OK. Settings loaded 2024Apr24</p> <p>System wide checks OK. Aida16 clock status fails. Aida16 ADC calibration fails. Rest OK.</p> <p>All FEEs look OK, we again see high rates in aida15 ~ 12k data items/sec, rate in other FEEs is 0.</p> <p>Testing of the pulser widths has been done. Pulser widths will be uploaded soon.</p> <p>Background run started. No beam, no target. File G22-201 and R2. Data being written is ~128 kb/s. Run will be left overnight, no night shift.</p> <p>28/05/24</p> <p>DAQ continues with alpha background run.</p> <p>System wide checks OK. Aida16 clock status fails. Aida16 ADC calibration fails. Rest OK. Temps OK</p> <p>Data can be seen in the spectrum browser on MIDAS. CARME monitoring code was started incorrectly yesterday. It has now be restarted and a small number of events are seen</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown