AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Apr 5 01:28:15 2025
Author
*
:
Subject
*
:
<p>18:19 Start or run 7: In beam has been optimzed up to now by Zoran and Claude. ~7E7 particles at injection. From now on, only the injection beamline is optimized by Operators.</p> <p>Detectors IN (left arm pot =18.86 mm, right arm pot = 19.80 mm)</p> <p>No Target</p> <p>Beam is in the ring for ~6 seconds and total cycle time between injections is ~8 seconds</p> <p>Injection beamline is still in process of optimization by operators</p> <p>21:30</p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>23:30</p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>01:30</p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>Beam and Electron Coller failure (~00:35); Beam back (~01:08); Cooler back (~01:20)</p> <p>03:00</p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>Beam and Electron Coller failure (~01:35); Beam back (~01:55); Cooler back (~01:55)</p> <p>04:40</p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>06:00</p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>07:00</p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p> </p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown