AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Sep 3 08:14:51 2021
Author
*
:
Subject
*
:
In order to install the detector supports and eventually install the detectors themselves CARME must be split and separated via rails. However it does not look like we have sufficient clearance on either side. See pictures attached. I suggest we mount the strain relievers wires and motors, not split CARME, and pump down + bake to give us time to figure out what is different from the models and how to fix it. Outgassing from detector supports should be negligible wrt wires. One possibility would be to install rail extension on the back side of the Al frame where the cross was meant to be supported, temporarily remove the tube connecting CARME to the YR09 valve and slide CARME back. Will need to discuss with Peter.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20210903_085801.jpg
Original size: 4000x2250
Attachment 2:
20210903_085805.jpg
Original size: 4000x2250
Attachment 3:
20210903_085811.jpg
Original size: 4000x2250
Attachment 4:
20210903_085822.jpg
Original size: 4000x2250
Attachment 5:
20210903_085958.jpg
Original size: 4000x2250
Attachment 6:
20210903_090003.jpg
Original size: 4000x2250
Attachment 7:
20210903_090024.jpg
Original size: 4000x2250
Attachment 8:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown