AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 13:06:05 2025
Author
*
:
Subject
*
:
> In order to install the detector supports > and eventually install the detectors > themselves CARME must be split and > separated via rails. > > However it does not look like we have > sufficient clearance on either side. See > pictures attached. > > I suggest we mount the strain relievers > wires and motors, not split CARME, and > pump down + bake to give us time to figure > out what is different from the models and > how to fix it. Outgassing from detector > supports should be negligible wrt wires. > > One possibility would be to install rail > extension on the back side of the Al frame > where the cross was meant to be supported, > temporarily remove the tube connecting > CARME to the YR09 valve and slide CARME > back. Will need to discuss with Peter.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown