AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Apr 5 00:42:45 2025
Author
*
:
Subject
*
:
<p>The cave is closed and beam is back</p> <p>The d intensity is about half of the intensity before the break</p> <p>The gas target is prepared but the valvas cannot be opened. Anton is coming in at around 1 PM to open the gate valves.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown