<p><strong>20:00</strong></p>
<p>The beam is set at the correct energy, operators cross-checked it again. What we see at 750 is due to the molecular beam. The operotors are trying to optimize and get rid of this in the next 30min.</p>
<p>Temps and system checks OK</p>
<p>Leakage current OK</p>
<p>Merger and tape server OK</p>
<p>Potentiometer at 28.06 mm and 29.23 mm</p>
<p><strong>20:30</strong></p>
<p>Keep going with the beam tests. A new peak appears around 950 keV( See attached). Still try to understand what it is. The operators keep going</p> |