23:47
Run 24 started - Beam on target
Beam energy is 1.5 MeV.
Horizontal beam position = 7.0 mm, vertical beam position = -1.0 mm.
Target density ~ 1e11 at/cm2 (Still Fluctuating, after temperature increase)
Beam intensity at inj ~ 2.5e7
Detectors are positioned IN. Left arm = 62.71, right arm = 64.60 mm
Histograms and stats zero'd, monitoring code restarted.
Beam in the ring ~ 10 minutes.
Pressure in YR09 E target ~ 5.2e-11 mbar.
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
00:23
Target density ~4.65e11 atoms/cm2
Beam intensity at inj ~ 2.7e7
Beam intensity dropped to 2.1e7 in 10 minutes. Proportionall this is much greater than before.
Run 24 stopped.
|