AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Apr 5 00:42:48 2025
Author
*
:
Subject
*
:
<p><strong>09:44</strong></p> <p>Run 26 started - Beam no target</p> <p>Beam energy is being increased from 1.5 to 3 MeV</p> <p>Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.</p> <p>Detectors are positioned fully OUT</p> <p>Histograms and stats zero'd, monitoring code restarted.</p> <p>Pressure in YR09 E target ~ 4.5e-11 mbar.</p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p> </p> <p><strong>10:48 (Attachements 1-4)</strong></p> <p> </p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>The detectors currently fully out for tuning.</p> <p> </p> <p> </p> <p><strong>11:57 (attachments 5-8)</strong></p> <p> </p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>The detectors currently fully out for tuning.</p> <p> </p> <p> </p> <p> </p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown