<p><strong>12:46 (attachments 1-4)</strong></p>
<p>Run 27 started - Beam no target</p>
<p>Beam energy = 3 MeV</p>
<p>Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.</p>
<p>Beam intensity at inj ~ 2.5e7</p>
<p>Detectors are positioned IN pneumatic only. Left arm = 62.71, right arm = 64.60 mm</p>
<p>Histograms and stats zero'd, monitoring code restarted.</p>
<p>Beam in the ring ~ 7 minutes.</p>
<p>Beam on BPM looks to be better than at previous energy.</p>
<p>Pressure in YR09 E target ~ 4.5e-11 mbar.</p>
<p> </p>
<p>Merger OK, Tape server OK</p>
<p>ADC data item statistics looks as before. OK</p>
<p>FEE temperatures look OK</p>
<p>System checks OK</p>
<p>Leakage current stable</p>
<p> </p>
<p><strong>13:45 (attachments 5-8)</strong></p>
<p>Merger OK, Tape server OK</p>
<p>ADC data item statistics looks as before. OK</p>
<p>FEE temperatures look OK</p>
<p>System checks OK</p>
<p>Leakage current stable</p>
<p> </p>
<p> </p>
<p><strong>15:15(attachments 9-12)</strong></p>
<p>Merger OK, Tape server OK</p>
<p>ADC data item statistics looks as before. OK</p>
<p>FEE temperatures look OK</p>
<p>System checks OK</p>
<p>Leakage current stable</p>
<p>Target density 1e10 atoms/cm2. Still working on the target.</p>
<p> </p>
<p> </p> |