AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 13:21:51 2025
Author
*
:
Subject
*
:
<p><strong>16:15</strong></p> <p>In the previous run while working on the target it was discovered that the valve was closed! Probaly this happened around 10 am, we are not sure.</p> <p>The gas target inlet valve is open again, working on the target.</p> <p> </p> <p>Beam energy = 3 MeV</p> <p>Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.</p> <p>Beam intensity at inj ~ 2.5e7</p> <p>Detectors are positioned IN pneumatic only. Left arm = 62.71, right arm = 64.60 mm</p> <p>Histograms and stats zero'd, monitoring code restarted.</p> <p>Beam in the ring ~ 7 minutes.</p> <p>Pressure in YR09 E target ~ 4.5e-11 mbar.</p> <p> </p> <p><strong>18:03</strong> ( Attchments 1 -4)</p> <p><strong>Still no target!</strong></p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p> </p> <p><strong>20:23</strong></p> <p>We have the target back. S1( grafana) 4.8e-8. The target thickness read by the system 5E11 atoms/cm2 but apparently the formula is wrong and the value should be almost e12 atoms/cm2.</p> <p>. We have now proper beam and target and we</p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown