AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 13:21:52 2025
Author
*
:
Subject
*
:
<p>Beam energy = 3 MeV</p> <p>Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.</p> <p>Beam intensity at inj ~ 2.5e7</p> <p>Detectors are positioned IN. Left arm = 36.54, right arm = 64.60 mm</p> <p>Cycle time ~ 6 minutes</p> <p> </p> <p><strong>01:05</strong></p> <p>Target density still very unstable</p> <p> </p> <p><strong>02:45</strong></p> <p>Target density has dropped to ~1e9 and has been at that level for 30 minutes. We will try to move the target a bit and see if we can get an increase. Target position is currently x=-12400, y=2900</p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p> </p> <p><strong>04:15</strong></p> <p>We were able to recover some target, but it is still very unstable. The new position is x=-12800, y=2000</p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p> </p> <p><strong>06:15</strong></p> <p>Target still unstable, fluctuating around the 5e10 region</p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown