<p>Beam energy = 3 MeV</p>
<p>Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.</p>
<p>Beam intensity at inj ~ 2.5e7</p>
<p>Detectors are positioned IN. Left arm = 36.54, right arm = 64.60 mm</p>
<p>Cycle time ~ 6 minutes</p>
<p> </p>
<p><strong>01:05</strong></p>
<p>Target density still very unstable</p>
<p> </p>
<p><strong>02:45</strong></p>
<p>Target density has dropped to ~1e9 and has been at that level for 30 minutes. We will try to move the target a bit and see if we can get an increase. Target position is currently x=-12400, y=2900</p>
<p>Merger OK, Tape server OK</p>
<p>ADC data item statistics looks as before. OK</p>
<p>FEE temperatures look OK</p>
<p>System checks OK</p>
<p> </p>
<p><strong>04:15</strong></p>
<p>We were able to recover some target, but it is still very unstable. The new position is x=-12800, y=2000</p>
<p>Merger OK, Tape server OK</p>
<p>ADC data item statistics looks as before. OK</p>
<p>FEE temperatures look OK</p>
<p>System checks OK</p>
<p> </p>
<p><strong>06:15</strong></p>
<p>Target still unstable, fluctuating around the 5e10 region</p>
<p>Merger OK, Tape server OK</p>
<p>ADC data item statistics looks as before. OK</p>
<p>FEE temperatures look OK</p>
<p>System checks OK</p> |