<p>8:13</p>
<p>Since 6:40 the target density dramatically dropped to 10^9 since then it has been unstable and did not recover. Currently it is around 8e8.</p>
<p>09:00</p>
<p>Target density has been increased to the high -10, very low -11 region. We will keep this run going unless the density is increased further.</p>
<p> </p>
<p>10:21</p>
<p>Beam energy = 3 MeV.</p>
<p>Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.</p>
<p>Target density ~ 1e9 at/cm2 (no target, get lost quite quckly)</p>
<p>Beam intensity at inj ~ 1.7e7</p>
<p>Detectors are positioned IN. Left arm = 36.54, right arm = 64.60 mm</p>
<p>Histograms and stats zero'd, monitoring code restarted.</p>
<p>Beam in the ring ~ 6 minutes.</p>
<p>Pressure in YR09 E target ~ 4.36e-11 mbar.</p>
<p> </p>
<p>Merger OK, Tape server OK</p>
<p>ADC data item statistics looks as before. OK</p>
<p>FEE temperatures look OK</p>
<p>System checks OK</p>
<p>Leakage current stable</p>
<p> </p>
<p>target density has been fluctuating between E9 to E12. We can very clearly see the increase in elastic counts on our detector during high density periods.</p>
<p>Attachment 1 - rate plots at 1E12 at/cm2</p>
<p>Attachment 2 - rate plots at 1E9 at/cm2</p>
<p> </p>
<p>12:26</p>
<p>Merger OK, Tape server OK</p>
<p>ADC data item statistics looks as before. OK</p>
<p>FEE temperatures look OK</p>
<p>System checks OK</p>
<p>Leakage current stable</p>
<p> </p>
<p>After reaching a density of > 10^12 a bit before 11:00, the valve got closed. When a valve is closed, can be observed a dramatic change in the plot and one of the three green ligths of atps7vaccrz1 (0,2,4) is turned off. Nikos opened it, and now it seems stable again around 1e11.</p>
<p> </p>
<p>14:07</p>
<p>Merger OK, Tape server OK</p>
<p>ADC data item statistics looks as before. OK</p>
<p>FEE temperatures look OK</p>
<p>System checks OK</p>
<p>Leakage current stable</p>
<p>15:05</p>
<p>Run stopped as target density is rubbish. Might as well get beam background</p> |