<p>15:15</p>
<p>Run 32 started - Beam, no target</p>
<p>Beam energy = 3 MeV.</p>
<p>Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.</p>
<p>Beam intensity at inj ~ 2.5e7</p>
<p>Detectors are positioned IN. Left arm = 36.54, right arm = 64.60 mm</p>
<p>Histograms and stats zero'd, monitoring code restarted.</p>
<p>Beam in the ring ~ 5 minutes.</p>
<p>Pressure in YR09 E target ~ 4.5e-11 mbar.</p>
<p>Motors code crashed. Beam removed from ring to re-home detectors.</p>
<p> </p>
<p>15:20</p>
<p>Beam in the ring again, detectors homed, no target</p>
<p>Detectors have been set up to send signals on injection / dump</p>
<p>15:35</p>
<p>Merger OK, Tape server OK</p>
<p>ADC data item statistics looks as before. OK</p>
<p>FEE temperatures look OK</p>
<p>System checks OK</p>
<p>Leakage current stable</p>
<p> </p> |