AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Tue Jun 4 18:08:04 2024
Author
*
:
Subject
*
:
<p><strong>19:08</strong></p> <p>Beam energy = 3 MeV.</p> <p>Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.</p> <p>Target density ~ fluctuating</p> <p>Beam intensity at inj ~ 1.7e7</p> <p>Detectors are positioned IN. Left arm = 36.54, right arm = 64.60 mm</p> <p>MBS signals saved from motors code</p> <p>Histograms and stats zero'd, monitoring code restarted.</p> <p>Beam in the ring ~ 6 minutes.</p> <p>Pressure in YR09 E target ~ 4.36e-11 mbar.</p> <p> </p> <p> </p> <p>Merger error recovered</p> <p>White rabbit time stamps</p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p> </p> <p><strong>21:27</strong></p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p> </p> <p><strong>23:00</strong></p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>Statistics attachment 5</p> <p>Merger attachment 6</p> <p> </p> <p><strong>00:42</strong></p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>Density is oscillating between E10 and low E11.</p> <p>attachment 7 is statistics, attachment 8 is temperature, attachment 9 is merger, attachment 10 is spectrum browser.</p> <p> </p> <p><strong>02:20</strong></p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>Density is oscillating between E10 and low E11. ( last 15 minutes below 2E10)</p> <p>attachment 11 -13</p> <p> </p> <p>From 2:00 target density falls below 2E10 and started decreasing to the E9 range. At 2:40 we started playing with x-y to get to higher density. At 3:30 we are at 5/6E10 and waiting to see if it stabilizesto that or if it needs more playing.</p> <p><strong>04:06</strong></p> <p><strong>Target density being 1-2E11 since 5 minutes</strong></p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>Attachment 14 statistics, attachment 15 merger</p> <p> </p> <p><strong>05;53</strong></p> <p><strong>Target density 1E10, sometimes e11, before going down to low E10 and we need to play a bit with x-y to recover it</strong></p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p>Attachment 16-18</p> <p> </p> <p><strong>07:35</strong></p> <p><strong>Target density 2.5E11, after changiny y position to 1000</strong></p> <p>Merger OK, Tape server OK</p> <p>ADC data item statistics looks as before. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current stable</p> <p><strong>09:00</strong></p> <p>Target density has not improved despite efforts last night. Mid 10 - low 11 density range. We have asked HKR to remove beam from the ring and allow access so Nikos can change the nozzle.</p> <p>Beam off now, access granted. Will begin warming nozzle. Internal cave work on changing nozzle expected to start at 11</p> <p>Run stopped.</p> <p>Final monitoring code histogram attached</p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Screenshot_from_2024-06-04_19-07-40.png
Original size: 3840x1080
Attachment 2:
Screenshot_from_2024-06-04_19-11-14.png
Original size: 3840x1080
Attachment 3:
Screenshot_from_2024-06-04_21-26-45.png
Original size: 3840x1080
Attachment 4:
Screenshot_from_2024-06-04_21-26-50.png
Original size: 3840x1080
Attachment 5:
Screenshot_from_2024-06-04_22-40-39.png
Original size: 3840x1080
Attachment 6:
Screenshot_from_2024-06-04_22-43-21.png
Original size: 3840x1080
Attachment 7:
Screenshot_from_2024-06-05_00-44-49.png
Original size: 3840x1080
Attachment 8:
Screenshot_from_2024-06-05_00-45-21.png
Original size: 3840x1080
Attachment 9:
Screenshot_from_2024-06-05_00-45-41.png
Original size: 3840x1080
Attachment 10:
Screenshot_from_2024-06-05_00-47-33.png
Original size: 3840x1080
Attachment 11:
Screenshot_from_2024-06-05_02-21-37.png
Original size: 1920x1080
Attachment 12:
Screenshot_from_2024-06-05_02-22-15.png
Original size: 1920x1080
Attachment 13:
Screenshot_from_2024-06-05_02-22-44.png
Original size: 1920x1080
Attachment 14:
Screenshot_from_2024-06-05_04-06-59.png
Original size: 3840x1080
Attachment 15:
Screenshot_from_2024-06-05_04-07-43.png
Original size: 3840x1080
Attachment 16:
Screenshot_from_2024-06-05_05-55-15.png
Original size: 3840x1080
Attachment 17:
Screenshot_from_2024-06-05_05-55-49.png
Original size: 3840x1080
Attachment 18:
Screenshot_from_2024-06-05_05-56-34.png
Original size: 3840x1080
Attachment 19:
Screenshot_from_2024-06-05_09-04-45.png
Original size: 1920x1080
Attachment 20:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown