AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 592     Entry time: Wed Jun 5 13:34:02 2024
Author: JM 
Subject: Run 37 - Change in thresholds 

14:20

Target nozzle currently being replaced. No beam

We have decided to switch to 15N beam from now on.

Beam energy for 15N is significantly higher than deuteron beam so we have increased the thresholds (slow comparator) slightly for all detectors to 500 keV (0x32).

ADC data item rates - attachment 1

Run 37 started. Alpha background

Data rate ~ 200 kb/sec

17:44

All system checks OK

20:00

All system checks OK

23:30

All system checks OK

01:25

All system checks OK

03:25

All system checks OK.

Target is stable at 3.5e11, with T1=29 K

05:30

All system checks OK

Target density has slowly drifted down, and is now 1.2e11

Attachment 1: Screenshot_from_2024-06-05_14-36-44.png  115 kB  Uploaded Wed Jun 5 14:38:02 2024  | Hide | Hide all
Screenshot_from_2024-06-05_14-36-44.png
ELOG V3.1.4-unknown