14:45
New run 55 with:
Right arm at 64.60 mm
Left arm IN at 36.54 mm
MBS working - hopefully
Target 7E11
Injection ca. 5E7
horizontal beam position 8.75 mm
vertical beam position -5mm
Changed electron cooler set point to 244.2 V
Read value 243.66 V
Collector current 4.31A
Rates OK. Temps OK.
15:00
Detector 0 was noisy. Shook arm. Fixed it.
16:15
Detector 0 was noisy. Shook arm. Fixed it.
There is no beam in CRYRING since 16:05.
16:25
The beam is back but it is still a bit unstable and the operators are still trying optimize it.
17:20
We just did standard detector/electronics checks. Everthing looks OK.
17:50
Take screenshots.
20:50
Detector 0 was noisy. Shook arm. Fixed it.
But now detector 2 seems to have lost the Rutherford peak.
Screenshots taken and attached.
21:05
We did "Check ASIC Control" following Carlo's advise. This fixed the detector 2, but the detector 0 got noisy again. Another movement of the detector fixed the noise again.
22:15
Detector 0 was noisy. Shook arm. Fixed it.
23:05
This run has finished. The cooler voltage will be increased by 0.1V for the next run.
The latest spectra and detector/DAQ status are in the attachment. |