<p><strong>21:00</strong></p>
<p>Claude has achieved optimal cooling parameters for the beam</p>
<p>No target and internal work inside the cave tomorrow is required</p>
<p>Run 63 going - beam only background</p>
<p>Right arm at 64.60 mm</p>
<p>Left arm IN at 36.54 mm</p>
<p>MBS fakemotion script running</p>
<p>High rates on top left dssd again. Cycle left servo motor two times resolved issue</p>
<p>Rates OK. Temps OK.</p> |