<p><strong>10:47</strong></p>
<p>The energy is changed to 247.4 V.</p>
<p>Read back value is 246.849 V.</p>
<p>Right arm at 64.60 mm</p>
<p>Left arm IN at 36.54 mm</p>
<p>MBS working - hopefully</p>
<p>horizontal beam position 8.75 mm</p>
<p>vertical beam position -5mm</p>
<p>Beam intensity 3.0e+7 particles.</p>
<p>e-cooler export controls before/after energy change - attachments 1 & 2</p>
<p>New run is R65. Target temperature is 37.6 K.</p>
<p>Values of E1 is 820 Hz, 2.12A, 6.01e-2 mbar, 2.8e+11/cm2</p>
<p><strong>12:34</strong></p>
<p>Systen checks all OK</p>
<p>Target density stable at ~1.5e11 at/cm2</p>
<p>E1 = 6e-2 mbar, turbo is fine</p>
<p> </p>
<p> </p>
<p>13,38 CB reboots RHS CRYRING control computer (atppc017) - appears to be a now unavoidable system update/reboot</p>
<p>13.39 DSSSD bias & leakage current OK - attachment 3</p>
<p>FEE64 temps OK - attachment 4</p>
<p>ADC data item stats OK - attachment 5</p>
<p>per FEE64 Rate spectra - attachment 6</p>
<p>Merger, TapeServer etc - attachments 7-8</p>
<p> data file R65_11</p>
<p>DSSSD bias & leakge current log - attachment 12</p>
<p>CARME DSSSD motion control - attachment 13</p>
<p> </p>
<p>13.42 E1 turbo 820Hz 2.2A 5.2e-2mbar</p>
<p>Target 3.45e+11/cm2 T1 36.6K</p>
<p>Beam c. 3e+7</p>
<p> </p>
<p><strong>15:20</strong></p>
<p>Stats OK. Temps OK.</p>
<p>Merger OK. Write to disk OK.</p>
<p> </p> |