14:45
New run 70 - beam on target with definite target overlap
Cooler voltage setpoint 247.3 V.
FC20 read value 246.75 V.
Right arm at 64.60 mm
Left arm IN at 36.54 mm
FakeMotion script running
horizontal beam position 1.0 mm (new beam target overlap)
vertical beam position -5mm
Beam intensity 7.0e+7 particles.
Target density ~6.3e11 at/cm2
Target temperature is 36.6 K. Values of E1 is 820 Hz, 2.6A, 1.4e-1 mbar
All system checks OK, data rate is ~ 260 kB/s. Statistics attached.
xy and energy histograms following ~20 mins attached.
15:45
I realised we have been running in bunched mode not coasting as we have been previously.
See attached screenshots (4-7) of last 1 hour of running. We will move to coasting. |