AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Apr 3 17:21:30 2025
Author
*
:
Subject
*
:
<p><strong>21:00</strong></p> <p>Target is lost. Background run is being collected.</p> <p>New run 72 - beam on target with definite target overlap [coasting]</p> <p>Cooler voltage setpoint 247.3 V.</p> <p>FC20 read value 246.75 V.</p> <p>Right arm at 64.60 mm</p> <p>Left arm IN at 36.54 mm18:00</p> <p>FakeMotion script running</p> <p>horizontal beam position 1.0 mm (new beam target overlap)</p> <p>vertical beam position -5mm</p> <p>Beam intensity 6e+7 particles.</p> <p>Target density ~3e9 at/cm2</p> <p>Target temperature is 90 K. Values of E1 is 820 Hz, 2.6A, 4.2e-2 mbar</p> <p> </p> <p>Aida03 detector T is stable.SCreenshot is attached.</p> <p> </p> <p><strong>22:27</strong></p> <p>Cooling fixed. Temps OK.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown