<p><strong>14:30</strong></p>
<p>New run 75 - beam on target with definite target overlap [coasting]</p>
<p>Cooler voltage setpoint 247.2 V.</p>
<p>FC20 read value 246.65 V.</p>
<p>Right arm at 64.60 mm</p>
<p>Left arm IN at 36.54 mm</p>
<p>FakeMotion script running</p>
<p>horizontal beam position 1.0 mm (new beam target overlap)</p>
<p>vertical beam position -5mm</p>
<p>Beam intensity 8.5e+7 particles.</p>
<p>Target density ~6e11 at/cm2</p>
<p>Target temperature is 36.6 K. Values of E1 is 820 Hz, 2.6A, 1.4e-1 mbar</p>
<p> </p>
<p><strong>16:00</strong></p>
<p>Beam intensity 8.5e+7 particles.</p>
<p>Target density ~4e11 at/cm2</p>
<p>Target temperature is 36.6 K. Values of E1 is 820 Hz, 2.6A, 1.68e-1 mbar</p>
<pre>
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats OK - attachment 3
</pre>
<p> </p>
<p><strong>16:58</strong></p>
<p>Pressure on E1 has risen to 1.74e-1 mbar. Target density ~4.5e11 at/cm2.</p>
<p>Turbo is decreased to 818-819 Hz. We will increase temperature sligtly to see if this helps.</p>
<p><strong>17:11 </strong></p>
<p>Increase in noise on top left DSSD. Correlates with spike in the source seen on lassie. Moved servo motor out then in. Problem resolved. </p>
<p>System checks OK</p>
<p><strong>18:35</strong></p>
<p>Tempature has been increase in small steps to 38.4 K. E1 appears to have stabalised at 1.71e-1 mbar. Turbo speed 818-819 Hz. </p>
<p>Target density ~5.5e11 at/cm2. We will wait to see how it evolves over time.</p>
<p><strong>18:47</strong></p>
<p>Increase in noise on top left DSSD. Correlates with spike in the source seen on lassie. Moved servo motor out then in. Problem resolved. </p>
<p><strong>20:55</strong></p>
<p>All checks OK</p>
<p>Tempature has been increase in small steps to 38.4 K. E1 1.81e-1 mbar. Turbo speed 818-819 Hz. </p>
<p><strong>21:48</strong></p>
<p>System checks OK</p>
<p><strong>22:14</strong></p>
<p>Run stopped</p> |