AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Wed Apr 9 01:25:12 2025
Author
*
:
Subject
*
:
<p><strong>07:00</strong></p> <p>We are changing to 5+ beam so that we can access higher energies and possibly observe a higher lying, wider resonance.</p> <p>Beam energy change to 1.06 MeV/u.</p> <p>Detectors out</p> <p>Target nozzle out</p> <p>Pressure in E1 had reached 2e-1 mbar and turbo was spinning down to 810 Hz. Pressure reduced and E1 has reduced to 8.2e-2 mbar. We may require a pressure increase when we want the target back?</p> <p>Run changed and out into no storage mode so we do not write rubbish to disk.</p> <p> </p> <p><strong>11:34</strong></p> <p>Beam tuning in the ring in progress</p> <p>Merger OK. Not writing to disk.</p> <p>Temps OK. Rates OK.</p> <p>Leakage current OK.</p> <p>Motors out. Target out.</p> <p> </p> <p><strong>13:31</strong></p> <p>Checks OK. Beam tuning near completion.</p> <p>Some data acquired during beam tuning attached.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown