<p><strong>07:00</strong></p>
<p>We are changing to 5+ beam so that we can access higher energies and possibly observe a higher lying, wider resonance.</p>
<p>Beam energy change to 1.06 MeV/u.</p>
<p>Detectors out</p>
<p>Target nozzle out</p>
<p>Pressure in E1 had reached 2e-1 mbar and turbo was spinning down to 810 Hz. Pressure reduced and E1 has reduced to 8.2e-2 mbar. We may require a pressure increase when we want the target back?</p>
<p>Run changed and out into no storage mode so we do not write rubbish to disk.</p>
<p> </p>
<p><strong>11:34</strong></p>
<p>Beam tuning in the ring in progress</p>
<p>Merger OK. Not writing to disk.</p>
<p>Temps OK. Rates OK.</p>
<p>Leakage current OK.</p>
<p>Motors out. Target out.</p>
<p> </p>
<p><strong>13:31</strong></p>
<p>Checks OK. Beam tuning near completion.</p>
<p>Some data acquired during beam tuning attached.</p> |