AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Aug 14 02:46:37 2025
Author
*
:
Subject
*
:
<p><strong>~ 2:00 17 June</strong></p> <p> </p> <p>Run 91</p> <p>Attempted to move the detectors closer to the beam, and move them in sync with the injection.</p> <p>Found best position was</p> <p>Right arm: s by 5 mm, r p in (not moving). No benefits from moving. 10 mm + r p in on sync results in beam clipping during injection. 69.55 mm not moving.</p> <p>Left arm: s by 5 mm, l p in (in sync with motion). Due to the short beam preparation time, only the trigger out was used as per screenshots below. 23.58 -- 67.90 moving.</p> <p>Saw spike on leakage current for both detectors on the right arm. Unsure if this because they are being moved, or because they were hit with beam. Leakage current recovered.</p> <p> </p> <p>Run 92 - acquired data as above.</p> <p>Rutherford locus more clear on left arm detectors. No clear sign of nuclear reactions signals.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown