AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 658     Entry time: Wed Jun 19 12:11:22 2024
Author: CB, RSS 
Subject: CARME status 

DSSD off

FEEs off

Motors out, pin inserted, compressed air closed, power removed from motors box.

Motors and temperature logs are in carme-gsi:logs/G22-200

 

Next experiment will install new setup attached to gas target. Some baking and vacuum operations required. Everything should stay off for safety until they are done.

ELOG V3.1.4-unknown