AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Wed Apr 9 01:25:11 2025
Author
*
:
Subject
*
:
- water flow/interlock checks check water flow to/from inflow/outflow manifolds check all coolant lines to all FEE64s are connected check USB-controlled ac mains relay 'water' LED illuminated water flow and dew point sensor interlocks OK - carme-gsi network cabling from patch panel YR10/2 yellow network cable to carme-gsi operating in 19" rack room (2.033) green network cable to carme-gsi operating in counting room (2.034) - boot carme-gsi systemctl start dhcpd start DHCP dynamic network configuration ssh -L 8080:proxy.gsi.de:8080 carme@atppc025 establish proxy port for AnyDesk access ssh -X pi@nnrpi1 /MIDAS/TclHttpd/linux-arm/TclHttpd-server & start MIDAS server ssh -X pi@nnrpi1 ./caen_screen.sh start CAEN N1419ET control interface - system log sudo tail -f /var/log/messages monitor system log e.g. filesystem mounts for FEE64 embedded processors - FEE64 power ON 8015 server Run Control Update DAQ RESET, SETUP enable histograms, waveforms, data trabsfer 1 as req'd Check ASIC load FEE64 temps System wide checks Synchronise ASIC clocks FADC Align & Check - all FEE64s System wide checks collect baseline stats x2 etc WR timestamp 8115 server merger tape server netvar NetVar.MERGE.RunOptions 0 -> 1
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown