| 23:20 JM thinks we cannot see 7Be locus on run 24. Possibly the right arm cannot get close enough. Stopped moving right arm Started moving left arm as previously: 32.52 mm -> 77.56 mm Checked with bunched beam: not clipping. Possibly we could go further in - to be decided.   Started run 25 Target - 1.1E12 atoms/cm2 Beam - 1.2E7 pps   Root histograms refreshed.   Temps OK - attach Stats OK - attach All checks OK Leakage OK - attach Spectrum browser 1, 7, 8 attached   00:00 Run continues OK Temps OK, Stats OK, Merger OK   01:15 Run continues OK Temps OK - attached Stats OK - attached Merger OK Rates OK - attached Also attached current histograms   03:10 Motors now moving 32.77 -> 77.56 mm. Unclear why, should not affect results. Target 1.1E12 atoms/cm2 Current 1.4E7 pps   Temps OK - attached Rates OK - attached All checks OK Merger OK   03:37 7Be locus appears to be clearly visible. Attach 18   04:32 Temps OK Rates OK Merger OK   05:30 Temps OK Rates - aida10 showes intermittently high rates around 10k. See attached. Seems to be linked to beam, already observed last night.   06:10 Temps OK Rates OK - aida10 still counting 10k with beam, 300 without Merger OK Histograms attached   7:23- LB,PW All checks OK, general behaviour consistent with previous observations. Beam current ~ 1E7 pps 8:40 All good, attachment 27 is the spectra. Beam current 1.3E7 pps. 9;50 All good, target very stable at 1E12 at/cm^2. Noticed also Aida01 and aida02 show same behaviour as aida10, but the maximum rate is between 1000-2000 (instead of the 10000-20000 of aida10)   Run 25 stopped 10:45, Run 26 started -> laser spectroscopy laser test |