AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 13:15:05 2025
Author
*
:
Subject
*
:
<p>Chamber has been vented back to atmosphere. </p> <p>Motor was able to be pulled back to insert bloacking pin once at atmosphere.</p> <p>Thermocouple feedthrough constructed with 4 thermocuples attached. Internal thermocouples each ~200mm in length with external thermocouples each ~1m in length. All were tested by plugging into TC08 and using baking code. Feedthrough will be installed under the motors flange tomorrow. </p> <p>Survey team come tomorrow morning, afterwhich ion pump and RGA will also be installed. </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown