<p>Chamber has been vented back to atmosphere. </p>
<p>Motor was able to be pulled back to insert bloacking pin once at atmosphere.</p>
<p>Thermocouple feedthrough constructed with 4 thermocuples attached. Internal thermocouples each ~200mm in length with external thermocouples each ~1m in length. All were tested by plugging into TC08 and using baking code. Feedthrough will be installed under the motors flange tomorrow. </p>
<p>Survey team come tomorrow morning, afterwhich ion pump and RGA will also be installed. </p> |