AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 7     Entry time: Wed Sep 9 21:01:48 2020
Author: JM 
Subject: Neg Feedthroughs 

4/6 of the neg feedthroughs installed. Continuity between the power pins, ground pin and the chamber has been checked, we observe 5-10 ohms between the power pins similar to previous checks on the heaters. Also attached are the crimps for the ground tag and feedthrough connector pins.  

Attachment 1: Photos.zip  3.134 MB  Uploaded Wed Sep 9 22:17:18 2020
ELOG V3.1.4-unknown