AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri May 30 07:27:41 2025
Author
*
:
Subject
*
:
<p><strong>08:27</strong></p> <p>No run going.</p> <p>Temperatures OK - attach</p> <p> </p> <p>Attempting to bias channel 3 again. Slowly ramping up.</p> <p>V = 60, I = 5.3</p> <p>V = 70, I = 6.1</p> <p>V = 80, I = 9.0 --> 6.2 (unstable). Decreasing bias.</p> <p>V = 70, I = 6.0 (stable again)</p> <p>Leaving at 70 V for a while to condition (?)</p> <p> </p> <p>Resetting the gnuplot graph. Old caen_current.dat moved to G22-205-caen_current.dat and copied in /TapeServer/G22-205</p> <p> </p> <p><strong>10:10</strong></p> <p>Temperatures OK</p> <p>Leakage current on channel 3 showed some issues, back to stable. See attached.</p> <p> </p> <p><strong>11:00</strong></p> <p>Temps OK</p> <p>Leakage current stable.</p> <p>Increased bias on channel 3 to 80 V. I = 6.2 uA stable. Leaving for a while.</p> <p> </p> <p><strong>12:45</strong></p> <p>Temps OK</p> <p>Leakage current stable</p> <p>Increased bias on channel 3 to 90 V. I = 6.3 stable. Leaving for a while.</p> <p> </p> <p><strong>13:30</strong></p> <p>Temps OK</p> <p>Leakage current stable.</p> <p>Increased bias on channel 3 to 100V. I = 6.3 stable. Hopefully it holds until the end of the beam time.</p> <p> </p> <p><strong>20:00</strong></p> <p>Leakage current on channel 3 had issues again and bias was reduced to 50 V. Remained stable. Turned to 60 V now. Still stable. See attachement.</p> <p>FEEs on detector for -> MEC</p> <p>Temps OK - attach</p> <p>Checks as before - attach</p> <p>Rates OK (four fees not counting as expected) - attach</p> <p> </p> <p>Deuterium beam in the ring at 2 MeV/A approx 2E8 pps, significant H2+ contamination.</p> <p>Deuterium target working, fluctuating around 5E12-1E13 atoms/cm2</p> <p>Vacuum in YR09 - 3E-10 mbar</p> <p> </p> <p>Beginning beam-target overlap measurements soon.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Screenshot_from_2025-05-30_08-28-08.png
Original size: 1920x1080
Attachment 2:
Screenshot_from_2025-05-30_08-37-17.png
Original size: 1920x1080
Attachment 3:
Screenshot_from_2025-05-30_10-10-12.png
Original size: 1920x1080
Attachment 4:
Screenshot_from_2025-05-30_13-29-57.png
Original size: 1920x1080
Attachment 5:
Screenshot_from_2025-05-30_20-00-13.png
Original size: 1920x1080
Attachment 6:
Screenshot_from_2025-05-30_20-00-17.png
Original size: 1920x1080
Attachment 7:
Screenshot_from_2025-05-30_20-00-27.png
Original size: 1920x1080
Attachment 8:
Screenshot_from_2025-05-30_20-00-37.png
Original size: 1920x1080
Attachment 9:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898