AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 704     Entry time: Fri May 30 20:06:48 2025
Author: JM, CB, NP 
Subject: Run35 

21:00

Run 35 started.

D+ beam deuterium target. D+ beam energy is 2 MeV/u. (beam calc calculation is 1.9211 MeV/u -> may be wrong cooler voltage, need to check grafana)

Target density is about 4e12 at/cm2. FLuctuations between 1e12 and 1e13 at/cm2.

All four detectors positioned fully out and stationary.

Left potentiometer = 18.86 mm

Right potentiometer = 19.8 mm

Ring cycle time is 1 minute. Note we see some hydrogen in in the spectrum, this disapears after a few seconds.

Target T1=30K, T2=31.9K.

Nozzle position x=-3.06, z=1.72 mm

YR09-Etarget pressure = 2.29e-10 mbar.

Cooler set value = 1126V, 15 mA. Read value = 1068V, 13.22 mA

Detector 4 is still a bit unstable in its leakage current but the data coming through looks good. Some crap is periodically written to disk when leakage current spikes. Attachment 1,2 for leakage currents.

Attachment 3,4 data rate to disk and statistics tab for when detector 4 is behaving. When not data rate can spike to 4000 kb/sec. Looks OK at the moment.

Attachment 5 - xy plot. We observe a circular shape on the detector. We are unsure of what this is at the moment. Offline analysis required.

Attachment 6 - energy histogram including Rutherford.

Attachment 7 - energy histogram just nuclear peaks.

Attachment 8 - beam calc with read values. 

Attachment 1: Screenshot_from_2025-05-30_21-22-53.png  39 kB  Uploaded Fri May 30 21:31:36 2025  | Hide | Hide all
Screenshot_from_2025-05-30_21-22-53.png
Attachment 2: Screenshot_from_2025-05-30_21-23-16.png  17 kB  Uploaded Fri May 30 21:31:45 2025  | Hide | Hide all
Screenshot_from_2025-05-30_21-23-16.png
Attachment 3: Screenshot_from_2025-05-30_21-23-30.png  107 kB  Uploaded Fri May 30 21:32:55 2025  | Hide | Hide all
Screenshot_from_2025-05-30_21-23-30.png
Attachment 4: Screenshot_from_2025-05-30_21-23-56.png  114 kB  Uploaded Fri May 30 21:33:04 2025  | Hide | Hide all
Screenshot_from_2025-05-30_21-23-56.png
Attachment 5: Screenshot_from_2025-05-30_21-26-17.png  704 kB  Uploaded Fri May 30 21:36:38 2025  | Hide | Hide all
Screenshot_from_2025-05-30_21-26-17.png
Attachment 6: Screenshot_from_2025-05-30_21-35-00.png  118 kB  Uploaded Fri May 30 21:36:47 2025  | Hide | Hide all
Screenshot_from_2025-05-30_21-35-00.png
Attachment 7: Screenshot_from_2025-05-30_21-36-58.png  214 kB  Uploaded Fri May 30 21:37:10 2025  | Hide | Hide all
Screenshot_from_2025-05-30_21-36-58.png
Attachment 8: beamCalc-D1.png  88 kB  Uploaded Fri May 30 21:41:04 2025  | Hide | Hide all
beamCalc-D1.png
ELOG V3.1.4-unknown