AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 714     Entry time: Mon Jun 2 17:48:07 2025
Author: JG, AG 
Subject: Run 44 scraper tests 

Same settings are Run 43 but with coasting beam and scrapers set to:  30 / - 30 mm.

 

all checks ok, but WR timestamp error, see attached

 

19:28 the Run 44 has been stopped.

Attachment 1: Screenshot_from_2025-06-02_18-51-24.png  125 kB  Uploaded Mon Jun 2 18:52:18 2025  | Hide | Hide all
Screenshot_from_2025-06-02_18-51-24.png
Attachment 2: Screenshot_from_2025-06-02_19-27-31.png  638 kB  Uploaded Mon Jun 2 19:28:45 2025  | Hide | Hide all
Screenshot_from_2025-06-02_19-27-31.png
ELOG V3.1.3-7933898