AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Tue Jun 3 11:16:07 2025
Author
*
:
Subject
*
:
<p>Run 47 started. Target cooling down after water cooler failure, beam only background</p> <p>D+ beam deuterium target. D+ beam energy is 0.5 MeV/u. (beam calc calculation is 0.5143 MeV/u). See previous entry for beamcalc.</p> <p>All four detectors positioned fully out and stationary.</p> <p>Left potentiometer = 18.86 mm</p> <p>Right potentiometer = 19.8 mm</p> <p>Ring cycle time is 10 seconds.</p> <p>Cooler set value = 297.2 V, 8 mA. Read value = 296.477 V, 6.97 mA</p> <p>All leakage currents look good (except dssd4, currently stable at V=40)</p> <p>Beam position. Vertical =0.0mm , Horizontal=0.0 mm</p> <p>Data rate ~ 25kB/s</p> <p>13:00</p> <p><strong>Run stopped </strong>to allow tuning of parameters for 0.35 MeV/u</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Screenshot_from_2025-06-03_12-20-25.png
Original size: 1920x1080
Attachment 2:
Screenshot_from_2025-06-03_12-19-36.png
Original size: 1920x1080
Attachment 3:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898