AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Jun 5 08:50:00 2025
Author
*
:
Subject
*
:
<p>09:49</p> <p>DSSD4 has been biased to 100V in steps of 5V from 60V. It was previously stable overnight at 60V - attachment 1</p> <p>Will keep an eye on it but looks OK at the moment. Current bias and leakage current - attachment 2</p> <p>I have reset DSSD4 FEES (13,14,15,16) to the LEC and lowered the thresholds to be in line with other FEES.</p> <p>Current slow comparator threshold for all FEES is 0x14 (200 keV).</p> <p>Attachment 3 shows current ADC data items statistics.</p> <p>Started a new run 51 with no beam and no target. Access to the cave is allowed.</p> <p>Current data rate is 800 kB/sec.</p> <p>All statistics and histograms in aida zero'd</p> <p>12:57</p> <p>Temps OK</p> <p>Rates OK - attached</p> <p>Merger OK</p> <p>System wide checks</p> <p> </p> <p>14:58</p> <p>Temps - OK</p> <p>Rates - OK</p> <p>Merger - OK</p> <p> </p> <p>15:00</p> <p>Beam tuning to start soon. No storage.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Screenshot_from_2025-06-05_09-38-05.png
Original size: 1920x977
Attachment 2:
Screenshot_from_2025-06-05_09-46-08.png
Original size: 725x462
Attachment 3:
Screenshot_from_2025-06-05_09-51-43.png
Original size: 1920x1014
Attachment 4:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898