As run 66, optimisation of beam completed
DSSD4 now working and thresholds to 0x30 (480keV), switched to LEC
Tape service at 1.7MB/s
Did NOT reset the root histograms!!
11:30 All checks OK
13:48 All checks OK
15:15, fULL CHECK, STATUS - Okay. Target density ~2E12
16:15 All Checks OK. Target 2.9e12
17:30, Full check! status - okay. target 2.3e12
18:30 All Checks Ok
19:30 All Checks OK
21:30: All System Checks OK but targte density started dropping around 8:20. Tried to move the nozel but any x direction made it drop alot and y did nothing. Values hovering steadily between 1.1e12 to 1.4e12. Will try and move nozel again in 1 hour.
22:40: Full check, Status -okay! thickness 1.4E12. For more details look at the attchments
00:55: Full check. All looks okay!
03:55: Full check. All looks good!
06:28 Checks OK. Target density has dropped and is ~9e11 at/cm2. It will require some attention this afternoon
07:00 Run stopped. Final histogram attached. Number of counts somewhat obscured by background level. |