AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 13:15:19 2025
Author
*
:
Subject
*
:
<p> </p> <table align="center" border="1" cellspacing="1" style="width:98%"> <tbody> <tr> <td style="background-color:#486090">Quote:</td> </tr> <tr> <td style="background-color:#ffffb0"> <p>Ion pump, RGA and additional gauge installed on the chamber.</p> <p>Our gauge is the one mounted above the NEG feedthrough, Michael's gauge is mounted below the feedthrough. Ion pump too large to install on the top of the vessel, sufficient room on flange immediately next to this top flange. </p> <p>Baking frame assembled around chamber, all required components fit within the baking volume. Insulation on baking tray and heaters set up and connected to pi controller. </p> <p>Pumpdown begun at 16:30. Turbopump on at 16:40. Unable to reach the required pressure for the hot cathod gauge before leaving the lab ~18:10. Suggests possible leak, pressure and leak check tomorrow morning.</p> <p>MACOR strain relief and plastic strain relief tested in edinburgh compared (see image). MACRO hole size is 2x bigger than the test piece, suggests mix up between radius and diameter for MACOR strain reliefs. </p> </td> </tr> </tbody> </table> <p>Vacuum group confirmed temperature limits for the RGA of 200°C without the electronics removed and 80°C with electronics installed.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown