AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 74     Entry time: Wed Sep 22 08:30:08 2021
Author: CB (remotely) 
Subject: CARME pressure during first XHV test 
CARME pressure moved to

https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?e=hEoZt7


Some photos overnight are over-exposed and pressure cannot be read. 
Might be able to fix with image processing if needed, but likely not worth the time. 

Baking started: 23/09/2021 14:00	
Photo frequency changed to once per 10 minutes.
ELOG V3.1.4-unknown