AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Jun 12 14:22:27 2025
Author
*
:
Subject
*
:
<p>15:00</p> <p>Cave closed, waiting for beam to come back.</p> <p>Reset all ASIC settings to those in elog 737</p> <p>DSSD4 remains OFF and is set to the MEC channel.</p> <p>ADC data items and data writing to disk - Attachments 1+2</p> <p>While the cave has been closed we warmed the target up to 80K and have now cooled back to 30.5K to increase the density which was dropping into the 10^11 range. We have now recovered densities in the mid 10^12 at/cm2 range.</p> <p>Detector leakage current plot - Attachment 3,4</p> <p>All system checks OK</p> <p> </p> <p>Started at 16:20</p> <p>EM and JG trying to get scintillator signals in MBS</p> <p>Configuration completed?</p> <p>Stopped 16:32</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Screenshot_from_2025-06-12_15-23-37.png
Original size: 1920x1014
Attachment 2:
Screenshot_from_2025-06-12_15-23-51.png
Original size: 1920x1014
Attachment 3:
Screenshot_from_2025-06-12_15-29-14.png
Original size: 1920x977
Attachment 4:
Screenshot_from_2025-06-12_15-31-19.png
Original size: 734x462
Attachment 5:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown