| <p>15:00</p>
<p>Cave closed, waiting for beam to come back.</p>
<p>Reset all ASIC settings to those in elog 737</p>
<p>DSSD4 remains OFF and is set to the MEC channel.</p>
<p>ADC data items and data writing to disk - Attachments 1+2</p>
<p>While the cave has been closed we warmed the target up to 80K and have now cooled back to 30.5K to increase the density which was dropping into the 10^11 range. We have now recovered densities in the mid 10^12 at/cm2 range.</p>
<p>Detector leakage current plot - Attachment 3,4</p>
<p>All system checks OK</p>
<p> </p>
<p>Started at 16:20</p>
<p>EM and JG trying to get scintillator signals in MBS</p>
<p>Configuration completed?</p>
<p>Stopped 16:32</p> |