AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 743     Entry time: Fri Jun 13 14:45:58 2025
Author: JG, SS, JM, CB, EW, AR 
Subject: Run 75 

 

90 keV/u beam on target, Target overlap confirmed with lifetime measurement using bunched beam - @ -12.5mm

We do not expect to see see Rutherford due to energy loss in the dead layer, using other particle detector for normalsiation.

Moved detectors in with servos only. Both arms are IN and stationary.

Left potentiometer = 36.54 mm

Right potentiometer = 37.96 mm

Horizontal beam position = -12.5 mm

Thresholds increased for all to 0x28 (400keV)

data rate is ~0.7 MB/sec

Electron cooler read values; Cooler voltage = 50V (dodgy accuracy need to ask about fc20 on monday), cooler current=0.26 mA.

15:50 All Checks ok. Overlap on beam found. Target at 4e12. Bottle at 90 bars.

 

Attachment 1: Screenshot_from_2025-06-13_16-01-44.png  132 kB  Uploaded Fri Jun 13 16:02:18 2025  | Hide | Hide all | Show all
Screenshot_from_2025-06-13_16-01-44.png
Attachment 2: 2025-06-13_15-59-53_YRT1_CRYRING_2025_D_Bruno_90keV.C1.txt  51 kB  Uploaded Fri Jun 13 16:49:52 2025  | Show | Hide all | Show all
ELOG V3.1.3-7933898