AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sun Jun 15 07:01:37 2025
Author
*
:
Subject
*
:
<p>08:00 New run started - run 80</p> <p>Run whilst they are optimising the beam after losing it, everything else same as previous runs</p> <p>ROOT histograms NOT zeroed</p> <p>All checks fine</p> <p>09:05 All checks okay</p> <p>Attachment 5 current histograms zoomed into area of interest, detector 3 only proton peak visible</p> <p>10:00 All checks okay</p> <p>11:00 All checks okay</p> <p>11:45 Run stopped as beam is back</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Screenshot_from_2025-06-15_08-09-05.png
Original size: 1920x1080
Attachment 2:
Screenshot_from_2025-06-15_08-09-00.png
Original size: 1920x1080
Attachment 3:
Screenshot_from_2025-06-15_08-08-05.png
Original size: 1920x1080
Attachment 4:
Screenshot_from_2025-06-15_08-07-56.png
Original size: 1920x1080
Attachment 5:
Screenshot_from_2025-06-15_09-55-36.png
Original size: 1920x1080
Attachment 6:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898