AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 756     Entry time: Tue Jun 17 19:10:07 2025
Author: NH, PMH 
Subject: Run 96 
20:00 - Go to YR cave to see what is going on

20:20 - Beam back

20:28 - Set Tape to Storage, rate ca 2500 kB/s
Temperature and rate OK, System wide checks OK

Target density low (4e12/cm2)

21:00 - target density still 4e12, Ey rate histograms attached (attach 4)

21:20 - Target density increased to 6e12, we see more indication of reactions

22:30 - All checks OK, tape rate still 2500 kB/s
Target density ~7e12/cm2, beam intensity ~1e9pps

23:00 - Target density 7.5e12/cm2, beam intensity: 1e9 pps. Particle detector rate: 8 kHz at injection
 Gas bottle pressure still above first tick 
 Target position X=-1000, Y=1400
 All running smoothly. CARME DAQ running OK. (Figs 5-7)
Attachment 1: Screenshot_from_2025-06-17_20-28-22.png  161 kB  Uploaded Tue Jun 17 20:28:51 2025  | Hide | Hide all
Screenshot_from_2025-06-17_20-28-22.png
Attachment 2: Screenshot_from_2025-06-17_20-28-43.png  130 kB  Uploaded Tue Jun 17 20:29:07 2025  | Hide | Hide all
Screenshot_from_2025-06-17_20-28-43.png
Attachment 3: Screenshot_from_2025-06-17_20-58-26.png  532 kB  Uploaded Tue Jun 17 20:58:36 2025  | Hide | Hide all
Screenshot_from_2025-06-17_20-58-26.png
Attachment 4: Screenshot_from_2025-06-17_21-02-19.png  225 kB  Uploaded Tue Jun 17 21:02:42 2025  | Hide | Hide all
Screenshot_from_2025-06-17_21-02-19.png
Attachment 5: Screenshot_from_2025-06-17_22-59-58.png  130 kB  Uploaded Tue Jun 17 23:00:05 2025  | Hide | Hide all
Screenshot_from_2025-06-17_22-59-58.png
Attachment 6: Screenshot_from_2025-06-17_22-59-48.png  468 kB  Uploaded Tue Jun 17 23:00:11 2025  | Hide | Hide all
Screenshot_from_2025-06-17_22-59-48.png
Attachment 7: Screenshot_from_2025-06-17_22-59-38.png  225 kB  Uploaded Tue Jun 17 23:00:18 2025  | Hide | Hide all
Screenshot_from_2025-06-17_22-59-38.png
ELOG V3.1.4-unknown