<p>On 21/9/21 CARME was connected to the leak tester. Leak testing showed no apparent leaks, extra time required to reach <1e-4 mbar during initial turbo pumpdown might be due to outgassing from additional installed components on the chamber. Turbo pump restarted </p> <p>21/9/21 16:28 9.73e-7 mbar</p> <p>21/9/21 16:48 8.92e-7 mbar</p> <p>21/9/21 17:28 7.88e-7 mbar</p> <p>elog 74 contains the pressure taken every hour after this point from the webcam. </p> <p> </p> <p>NEG and NEG-ion cables for controller modules connected to feedthroughs on the CARME chamber. Feedthroughs have been electrically checked and are OK.</p> <p>CARME baking jacket constructed around chamber. Thermocouples in place around the chamber. Vacuum group are coming tomorrow morning to inspect and de-gas installed gauge, after they are finished we mount final pieces of baking jacket and begin baking. </p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown