| <p>On 21/9/21 CARME was connected to the leak tester. Leak testing showed no apparent leaks, extra time required to reach <1e-4 mbar during initial turbo pumpdown might be due to outgassing from additional installed components on the chamber. Turbo pump restarted </p>
<p>21/9/21 16:28 9.73e-7 mbar</p>
<p>21/9/21 16:48 8.92e-7 mbar</p>
<p>21/9/21 17:28 7.88e-7 mbar</p>
<p>elog 74 contains the pressure taken every hour after this point from the webcam. </p>
<p> </p>
<p>NEG and NEG-ion cables for controller modules connected to feedthroughs on the CARME chamber. Feedthroughs have been electrically checked and are OK.</p>
<p>CARME baking jacket constructed around chamber. Thermocouples in place around the chamber. Vacuum group are coming tomorrow morning to inspect and de-gas installed gauge, after they are finished we mount final pieces of baking jacket and begin baking. </p>
<p> </p> |