AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Tue Aug 26 14:43:44 2025
Author
*
:
Subject
*
:
<p><strong>26 August</strong></p> <p><strong>14:40</strong></p> <p>Turned CARME on </p> <p>Everything started up okay, all detectors on and stable. </p> <p>Note aida16 clock and ADC are uncalibrated. Note dssd4 is on MEC</p> <p>Detector 1 noisy. </p> <p>AIDA started - all okay. </p> <p>All FEEs set to LEC (0x0) and slow comparator threshold set to 300keV (0x1e). </p> <p>Currently writing to data to G22-205/R100, doing background run, ~400 kB/s. </p> <p>16:40</p> <p>Checks OK. </p> <p>19:00</p> <p>Checks OK</p> <p>22:30</p> <p>Temps OK, Rates OK</p> <p>x2go window size weird on different monitor as well.</p> <p><strong>27th August</strong></p> <p>Stopped Run 100. We had accidently set the threshold to 140 keV (0xe) not 300 keV (0x1e) as intended. </p> <p>Either way we require data on the alphas for electronics testing in October and the data rate at this threshold is too high. Threshold set to 0x64 (1 MeV) to look only at the alphas. </p> <p>Run 101 started. See attached leakage currents</p> <p>20:30</p> <p>Checks OK</p> <p><strong>28th August</strong></p> <p>10:00</p> <p>Checks OK</p> <p>CARME daq crashed this afternoon. Aida14 had a disconnection error. Seemed to coincide with dssd4 tripping again. </p> <p>Rebooting FEEs. On reboot there are always some FEEs which seem to have some error. The FEE changes each time. i.e aida12 one time, aida09 next time. I will give them a little while to compose themselves before trying again. </p> <p>Unable to get the system writing data to disk again. I think the system is unhappy with the merger / tape server not being closed properly. Will have a proper look tomorrow. </p> <p><strong>29th August</strong></p> <p>20:15</p> <p>Running again R102. 0x64 slow comparator thresholds. DSSD4 off due to leakage current tripping -> MEC</p> <p><strong>30th August</strong></p> <p>Daq continues R102</p> <p><strong>31st August</strong></p> <p>Daq continues R102</p> <p>11:30</p> <p>R102 stopped. CARME shutdown. This week, potentially tomorrow morning, the Kasell group will dismount the VUV spectrometer. CARME off and bias off during these works. </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
bias.png
Original size: 787x448
Attachment 2:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898