AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  CARME  ELOG logo
Message ID: 765     Entry time: Tue Jan 13 12:59:37 2026
Author: JM, EW 
Subject: CARME startup - Jan26 tests 

13/01/26

Arrived at GSI.

Biased DSSDs. Noticed higher leakage currents than previous experiment circa 19uA for DSSD#1 and #3 and 9uA for DSSD#2 and #4

Checked inside the cave. Edinburgh vacuum gauge was ON. Vacuum group gauge OFF. Turning off the Edinburgh gauge lowered leakage currents to those from D+D experiment. See attachment 1.

Noticed the water interlock was tripped reading 0 l/s. Water was ON. Interlock was not properly connected to the pipe anymore. We pushed it back onto the pipe and taped it on hard - hopefully it holds for the time being

Attempted to re-start the system, encountered a pop up error message when trying to power the FEEs.

Required reboot of both the carme-gsi computer and nnrpi1, likely as we had been accessing remotely via x2go as well.

AIDA fully started up again.

All DSSDs biased to 100V, except DSSD1 which requires 115V otherwise we get >100k on the rates. Leakage currents are 16.25uA, 5.4uA, 15.17 uA and 6.56uA. Current logging is ON

Data being saved in new file Jan26

All slow comparator thresholds set to 0x64 (1 MeV)

All system checks OK.

ADC data items rate on all FEEs is 100-200 Hz except aida15 which is 13k Hz. This is the same as in D+D. See attachment 2

R1 is just the startup file (empty). R2 is currently running as a background run. Data rate to disk is 100 kB/sec. 

 

We have looked at the pulser widths of all FEEs for 1.8L (layout 3 and 4). Note the pulser amplitude is 90,000.

See attachments 3 and 4 for pulser peaks

See attachment 5 for the rates across each FEE

See attachments 6,7 for the waveforms.

Pulser widths with original config:

  AIDA01 AIDA02 AIDA03 AIDA04 AIDA05 AIDA06 AIDA07 AIDA08 AIDA09 AIDA10 AIDA11 AIDA12 AIDA13 AIDA14 AIDA15 AIDA16
Original config 133 139 96 123 74 75 86 82   129 99 103 141 120 138  

Tomorrow we will swap out the adaptor cards for DSSD#2 (aida 5,6,7,8). The pulser widths look the best for these so it will make for the best test and also this DSSD has low leakage currents and no other obvious issues (i.e missing strips, fluctuating leakage current, curses)

Background run with unchanged configuration to be left overnight. R2

21:00

R2 continues. All checks OK.

Note the merger appears to no longer display properly. Appears to have frozen - see attachment 8

Daq is still running however, and data is being saved to disk still. Merger must therefore still be working and it is just the gui that is failing.

Attachment 9 shows energy spectra so far.

09:30

R2 continues. All checks OK

Leakage currents slightly higher than yesterday, periodic cycle probably. Attachment 10

Attachments 11 and 12 show the energy histogram and xy plot from the overnight run. Since all xy quadrants on each dssd are working all FEEs must be functional and merging even if merger gui isn't displaying correctly.

 

 

Attachment 1: Screenshot_from_2026-01-13_14-03-51.png  27 kB  | Hide | Hide all
Screenshot_from_2026-01-13_14-03-51.png
Attachment 2: Screenshot_from_2026-01-13_14-16-22.png  110 kB  | Hide | Hide all
Screenshot_from_2026-01-13_14-16-22.png
Attachment 3: Screenshot_from_2026-01-13_15-07-14.png  145 kB  Uploaded Tue Jan 13 14:14:12 2026  | Hide | Hide all
Screenshot_from_2026-01-13_15-07-14.png
Attachment 4: Screenshot_from_2026-01-13_15-01-58.png  141 kB  Uploaded Tue Jan 13 14:14:38 2026  | Hide | Hide all
Screenshot_from_2026-01-13_15-01-58.png
Attachment 5: Screenshot_from_2026-01-13_15-09-14.png  176 kB  Uploaded Tue Jan 13 14:14:46 2026  | Hide | Hide all
Screenshot_from_2026-01-13_15-09-14.png
Attachment 6: Screenshot_from_2026-01-13_15-11-14.png  174 kB  Uploaded Tue Jan 13 14:14:51 2026  | Hide | Hide all
Screenshot_from_2026-01-13_15-11-14.png
Attachment 7: Screenshot_from_2026-01-13_15-12-28.png  167 kB  Uploaded Tue Jan 13 14:15:02 2026  | Hide | Hide all
Screenshot_from_2026-01-13_15-12-28.png
Attachment 8: Screenshot_from_2026-01-13_20-46-42.png  103 kB  Uploaded Tue Jan 13 19:47:01 2026  | Hide | Hide all
Screenshot_from_2026-01-13_20-46-42.png
Attachment 9: Screenshot_from_2026-01-13_20-49-38.png  195 kB  Uploaded Tue Jan 13 19:49:51 2026  | Hide | Hide all
Screenshot_from_2026-01-13_20-49-38.png
Attachment 10: Screenshot_from_2026-01-14_09-30-36.png  27 kB  Uploaded Wed Jan 14 08:32:32 2026  | Hide | Hide all
Screenshot_from_2026-01-14_09-30-36.png
Attachment 11: Screenshot_from_2026-01-14_09-30-14.png  202 kB  Uploaded Wed Jan 14 08:32:38 2026  | Hide | Hide all
Screenshot_from_2026-01-14_09-30-14.png
Attachment 12: Screenshot_from_2026-01-14_09-30-21.png  275 kB  Uploaded Wed Jan 14 08:32:43 2026  | Hide | Hide all
Screenshot_from_2026-01-14_09-30-21.png